Compatible Accessories:
Vestil Pallet Rack Beams: They are used to join the uprights of the rack to form a bay or section of pallet racking. In order to properly position the uprights, this pallet racking frame might require the installation of two beams.
Standards and Approvals:
Frequently Asked Questions:
Q. How many uprights are needed for two 'runs' on pallet racking?
A. You will need 3 Vestil PRTD frames for two continuous 'runs' on the pallet racking.
Q. How to install Vestil PRTD-10-42-24 24 pallet rack frame?
A.
- Place the pallet rack on a flat & even surface. When deciding where to install, keep in mind the need for aisle space to accommodate lifting equipment.
- Place an upright frame in the desired location and mark the floor with bolt holes in the footpads.
- Anchor bolts should be 1/2 inch in diameter to match the bolt holes in the footpads of the upright frame pieces.
- Drill anchor bolt holes and install anchoring devices.
- Slide a lock washer followed by a flat washer onto each bolt, before bolting the upright frame to the ground.
- The bolts should then be inserted through the bolt holes in the footpads and into the anchoring device.
- Insert the beam locking tabs (at the same height on both ends, so that the beam is level) into the teardrop openings in the uprights to install the beams.